PT001234
Scan for quick access
This tool requires proper training and adherence to safety protocols. Always inspect before use and follow manufacturer guidelines.
Complete operating manual and safety guidelines are available. Contact supervisor for access to documentation.
Daily operational check
June 08, 2025
Detailed safety check
June 03, 2025
Portable Appliance Testing
May 15, 2025
Precision and safety calibration
Due: September 2025
April 10, 2025 - Blade Replacement
New cutting disc installed, guards checked
February 20, 2025 - General Maintenance
Motor cleaned, bearings lubricated
July 10, 2025 - Routine maintenance
Motor inspection and blade check required
Used by: Ali Ahmed • Duration: 45 minutes
Used by: Ahmed Hassan • Duration: 30 minutes
Used by: Ali Ahmed • Duration: 1 hour 15 minutes
Last Updated: Jun 22, 2025 11:57 AM • Noble HSE Management System